Requests

 
time
Beam
Priority
Who  
Aperture measurements in injection regions
2
2
high
BG  
Beam dump studies
6
2
high
BG JU

- synchronisation.
 - aperture in extraction channel.
- MKB/MKD waveform characterisation.
- abort gap keeper tests

Steering at injection
2
2
high
JW, MM

steering at injection point - TI8 MBIAH?

Screen matching
2
1 & 2
high
  Need to understand optics discrepancies
Complete MKI waveform measurements,
2
1 & 2
MB, JU

IP2, finish scans (0.5 h).
- IP8, scan (1.5 h).

Setting up of TDI and TCLI
2
1 or 2
BG, VK IP2 OR IP8
Continue TCDI setting-up studies
4
2
BG, VK TI8 V plane
Dispersion  studies
2
2
MM, JW

Check stability of initial conditions
- Knob/cancellation
- Rematching

Kick response
1
2
  Complete TI8/LHC
BLM threshold tests/BLM beam permit disable functionality
2*2
1 &/or 2
high
BD, JW

Saturday 12:00 am --> 10:00 pm ?
Not saturday morning

TI2/8 momentum aperture / LHC fRF trim range checks
JW seems there is beam loss !
BLM triggers with beam on TDI (should be parasitic)
1
  The absence of a  response was puzzling.
Sector 23, to do further checks on some quadrupoles.
3
FZ  
higher-order studies of sextupoles, skew sextupole and octupole circuits
4
S23 and/or in S78 (&67)
FZ only if the momentum offset can be increased to ~2.5 per mil

Test with beam of 2-in-1 collimators (transverse tankmovements)

2
 
1 & 2
Coll  

Beam losses and transmission studies with different collimator settings in IP3 and IP7

2*2
IP3 & IP7
Coll  
Momentum aperture measurements in sector 2-3 (arc + IP)
2
1
SR  
Aperture measurements in sector 7-8 (& 67, 56)
4-6h in the night
SR  
Alice/LHCb spectrometer
2*3
1 & 2
ML. JW