IR7 Vacuum Layout - Sector test

Coming away from Q6 - baseline vacuum installation - red - b2

    start end
VIKH.A6R7.M flange on Q6 20217.7634 20217.7634
VADL.6R7.C Sector Valves 20216.4374 20217.0924
?      
VMACB.6R7.R Vacuum Modules DN100   [0.3 m] 20215.2924 20215.5924
VCDQO.6R7.R Vacuum - Chamber - Circular - Drift space - standard 80 mm   [4.3820 m] 20210.9104 20215.2924
VMHSB.B6R7.R Vacuum Modules   [0.3 m] 20210.6104 20210.9104

This brings us to the position of MBW.D6R7 (D4)  which starts at  20210.6104.  This won't be there of course.

If we push on down with a 7 m temporary section of vacuum chamber this brings us to  20203.6104.

Compatible with DCUM location 20202.39  for FBCT suggested by Rhodri.

However all sorts of stuff has to be installed on beam 1 - including a TCLA - would imagine that b2 components would be in the way - so temporary all the way might well be best.

In this case - assume sector valves in place and put in two 7 m. sections - this bring us to 20302.4  - which is the DCUM location 20202.39  for FBCT suggested by Rhodri.