Time | Phase | Resp | Approx elapsed time | |
---|---|---|---|---|
Friday pm | Access system - Beam ON | |||
Friday pm | Final prep of TI2 and EiS | Rossano | 1 hour | |
Friday 16:00 | Final Interlock tests | Bruno/Ben | 1 hour | |
Friday 15:20 | Beam on to TI2 TED Cycle LHC Sector 23 |
OP | 1 hour checks - trajectory etc. | Beam down TI2 first shot |
Friday 19:00 | TI2 TED out, beam to TDI, kickers off Give Alice 20 minute warning before taking TED out |
INJ | 2 hours | Beam on TDI after correction end TI2 |
Friday 21:00 | Kickers on, time in, position checks Resolve timing issues |
INJ | 2 hours | Interesting collaboration between timing and RF |
Friday 21:40 | TDI out - threading - momentum matching - beam to IR3 - beer | Jorg & team | 3 hours | Beam to IR3 first shot. Tweak SPS. |
Over night Fri-Sat | Kick-response measurements | Jorg & team | 8 hours | Beam induced quench of RB.A8.L3 at 02:19 Access required to replace quench heater power supply (not related to above quench) |
Saturday am | Access point 3 & Alice | |||
15:00-17:00 | Steering , RF, BI - beam to IR3 | 15:00 Beam back to IR3 | ||
17:00 - 20:00 | Injection region aperture checks - TDI in | Bren & team | 4 hours | TDI in 16:55 - Aperture checks half done |
19:13 Injection kickers - fault off - system reset required - no beam for 2 hours+ | 22:05 beam back | |||
22:00 | Kick-response measurements revisited Beam trhough IR3 nor problems. Instrumentation & optics look good. |
Jorg, Massimo, Stefano | 23:05 Beam through IR3 | |
22:00 - 07:00 | Gentle aperture measurements Very nice set of measurements taken over night. |
Stefano | 8 hours | |
09:00 - 14:00 | Dispersion plus RF 13:55 - dispersion measurement OK |
OP Andy and Philippe | Lots of fun with RF system, crashing counters and stuff - sorting essential problems |
|
14:00 ish Sunday | Polarity checks etc (Injection screen measurements in parasitic mode - OK) |
Frank | 3 hours | Tested BPM response with lower intensity from PS
|
16:00 | - finish aperture checks of injecton region - injection kicker delay scan & trajectory TDI in |
Brennan & co | 3 hours | Ok |
Re-cycle - reset | followed by problem with quench heater, injection kickers | |||
Sun night | Beam through IR3, BLM response IR3, re- check optics | Bernd & co Stefano & co |
4 hours | |
06:00 | End test | |||
08:00 | Start radiation survey, establish zones (areas which have seen beam) | RP | 4-6 hours |