As for transfer line test plus...
Priority | Resources | Test |
Status | Who | |
Database configuration, calibration curves, optics, additional hardware | 1 |
Standard facilities already tested |
31 July |
Complete/tested
|
LSA |
angle and position of beam at injection point | 1 |
YASP in place |
31 July |
In place & tested | Jorg |
Septa functions - check calibration curve | 1 |
Done | Jorg |
Priority | Test | Status | Who | |
SDDS - acquistion and monitoring - already implemented LHC: BPMs, BLMs, Screens, BCT |
1 | Week 31 | OK | Verena |
Concentration: Publication of data through middle tier - BLMs and BPMs | 1 | Now | BPMs deployed |
Marek (BPM) Marek (BLM) |
Triggered Data Acquisition or SBS logging | 1 | Now | To test and check | Romain/Delphine/Nicolas |
System | What | Test | Status | Who | |
Beam Loss Monitors | Acquisition - CMW, subscription, concentration, republish for monitors involved | Thurs 31st July | Done | Marek | |
FD - histogram - etc. Bespoke display for standard control use - configurable - select monitors - history etc.- | Thurs 31st July | In place | Fabio | ||
Expert application: detailed look at acquired data. Timed acquistion - read buffer - software trigger | BI (Stephen Jackson...) | ||||
Specialized application for BLM threshold management and adjustment - MCS [won't be used in sector test but should test]. Also test procedures - removal of beam permit etc. | Will not try during test | Done - ready to test |
Greg | - | |
Study buffer - trigger on injection event & application (Fabio) & concentration |
Check Fabio's app | To test on S78 | |||
Database headache | Name changes etc etc | Riot act read | |||
Crates | S2-3 crates down/ random bit changes | ||||
Beam Position Monitors | "Beam Threading" acquisition & concentration from each BPM crate involved. Very important. | 31st July | OK | Marek | |
Fixed Display - use YASP | 31st July | OK | YASP | ||
Intensity | OK | Nicolas - meas MArkus Fixed display |
|||
Trajectory: threading,
correction etc. etc. plus associated tools, harmonic analysis etc. etc
(mostly done already) Check corrector cc & trim checks |
31st July | OK | Jorg/YASP & LSA support |
||
Beam Current Transformer | Acquisition | 31st July | OK | Markus | |
Display | OK | Markus | |||
BTV | Acquisition - SDDS etc. | 31st July | OK | Verena | |
Screen control | 31st July | OK | standard LSA | ||
Application | 31st July | OK | Guy/Fabio | ||
Beam Synchronous Timing | Not visible at high level - we hope [BI's group's responsibility) | Need to test capture very thoroughly | - | ||
Radmon - Thijs | Acquisition & Monitor Gateways covering Q5.L2 to IP3.R available week 30 (cfc-sr-sl2a, cfc-sr2-sr2b, cfc-sr3-st3a) c/o Anna Nyul |
Anna will provide crates spanning 2-3 for week 31 | Check - need acquistion RadMonDev |
||
Leave concentration | |||||
Display & logging (SIMA variables there) Alarms |
Equip monitor | Greg Nicolas - logging |
What | When | Who | |||
Injection Kickers | State control settings & trim & timing - application |
Needs improvements | version in place Fixed display there (Markus) |
GHH | |
Analogue Acquisition (plus beam) | Standard interface | Looks OK | Oasis | ||
Septa | trim in terms of strength - trim interface | LSA - | Check | ||
Functions - standard muGef | Done | Check | - | ||
Timing | Standard | Check | - | ||
Monitoring - to be defined | Extension of existing | Check | |||
TDI | Application - settings generation - as for collimators -in & out | Stefano | For HWC | Stefano | |
TCCD | Monitoring | Extension of existing | |||
Power Converters | Standard high-level control functionality: cycle, ramp, set, trim, states, tolerances Full funcitonality already in place for HWC |
From sequencer see below |
Mike/Delphine | ||
Acquisition: debugging, tracking studies... to be defined | Mike | ||||
Appropriate handling of nested power supplies | Background | Mike/Delphine | |||
Magnets |
|
FIDEL | Handover of 23 to OP | Luca/Mike/Marek S/Nicholas Sammut | |
deGauss cycle - recycle of deGauss - all magnets Cycle prescription for all magnets |
Extend | finish | Lasse/Mike | TEST | |
BIC | Logging |
Task | What | Status | Who? | |
Timeslice of functions, actual settings etc | done | Wojtek | ||
Actual make rules | done | Lasse/Mike/Delphine | ||
Incorporation | new version to test | Raphael/Wojtek | ||
Optics, Twiss transfer - new optics for TI2 to load | done | Marek | ||
Full operational cycle - nominal generation - all multipoles etc | Check! | Lasse/Mike/Delphine | ||
Kickers, Septa, No ramping - should be simple |
check | Delphine/Stefano/Mike |
What | Status | Who | ||
Trim functionality - already in place - some extensions - testing | Wojtek | |||
Trim discrete settings | Wojtek | |||
Crossing angle, separation bumps | there - check 0 | MAD import | ||
Phase advance | YASP | |||
Trim actual settings GUI | One day! | Markus | ||
Trim LHC momentum | Marek S |
Chris/Delphine/Mike - Sisyphean 1
Ilya/Frank/Jutta - work in progress - basics for on-line model
Test | Who | ||
Task: create actual settings | Week 31 | Reyes |
|
Task: set all power converters | |||
Task: sequence injection requests - interface with CBCM | |||
Task: maintain mode and distribute mode change | |||
Software start, injection requests etc etc |
Task | Who | ||
Interface to timing system: |
Done | Delphine | |
Transfer synchronization: pre-pulses | Andy |
Display | Resources |
|
Markus. Using standard facilites hopefully. Should be a matter of configuration - weeks plus support |
Run control from sequencer - OK
Not strictly required. Test with BLM thresholds. Verena leading charge. Will use sub-set of LSA functionality. NOT DURING TEST.
Should be tested - should not get in the way of the test - check. Leave it.
Power permit and abort (PICs) will need to be in place. WIC. Alice. Vacuum.
What are we monitoring? Jorg, Jakob
Transfer line - everything
MKI Soft start
LHC PC state, SD currents
OK - clock the fill number - Done - to test
Take as given the standard facilities for all systems.
Work in progress - ML July 08